Indisponible en français

Résumé Preview

This document specifies the general principles and basic requirements of design for small hydropower (SHP) projects up to 30 MWe, mainly including hydrology, geology, energy calculations, project layout, hydraulics, electromechanical equipment selection, construction planning, project cost estimates, economic appraisal, social and environmental assessments.

Application of this document is intended to be site specific, with the principles and requirements of design applied in accordance with the needs of proposed hydropower plant.


Informations générales

  • État actuel :  Publiée
    Date de publication : 2021-03
  • Edition : 1
  • :
    ISO/TMBG
    Bureau de gestion technique - groupes
  • 27.140
    Énergie hydraulique

Acheter cette norme

Format Langue
PDF + ePub
Papier
  • CHF178

Vous avez une question?

Consulter notre FAQ

Service à la clientèle
+41 22 749 08 88

Horaires d’ouverture:
De lundi à vendredi - 09:00-12:00, 14:00-17:00 (UTC+1)

Suivez l'actualité de l'ISO

Inscrivez-vous à notre Newsletter (en anglais) pour suivre nos actualités, points de vue et informations sur nos produits.