Abstract

This document provides the guidance to perform commissioning testing for ballast water management system (BWMS) using electrolytic methods following the installation on board a ship. It specifies the procedures for installation inspection, commissioning to test the BWMS, biological efficacy verification and training of crews, in order to verify the BWMS functions and operates properly.