Abstract
Specifies the recommended procedure for the installation of asbestos-cement pipelines for both pressure and non-pressure installations. Covers the types of laying conditions most commonly encountered in practice. Describes handling and storage, stringing out, lowering, laying, jointing and anchorages of the pipes as well as excavation and preparation of the trench and house service connections.