Тезис
ПредпросмотрISO/TR 17177:2015 provides guidance for installations, equipment and operation at the ship to terminal and ship to ship interface for hybrid floating and fixed LNG terminals that might not comply with the description of "Conventional LNG Terminal" included in ISO 28460.
ISO/TR 17177:2015 is intended to be read in conjunction with ISO 28460 to ensure the safe and efficient LNG transfer operation at these marine facilities.
ISO/TR 17177:2015 also addresses high pressure natural gas (HPNG) at the transfer interface at facilities where liquefaction or regasification is undertaken, but does not describe requirements for the process plant generally forming part of the terminal facility.
These guidelines are based around facilities that are currently in operation or under development.
-
Текущий статус: PublishedДата публикации: 2015-04
-
Версия: 1
-
Технический комитет: ISO/TC 67/SC 9 Production, transport and storage facilities for cryogenic liquefied gases
-
- ICS :
- 75.200 Petroleum products and natural gas handling equipment
Приобрести данный стандарт
Формат | Язык | |
---|---|---|
std 1 145 | PDF + ePub | |
std 2 145 | Бумажный |
- CHF145
Жизненный цикл
-
Сейчас
PublishedISO/TR 17177:2015
Стандарт, который пересматривается каждые 5 лет
Этап: 90.93 (Подтверждено)-
00
Предварительная стадия
-
10
Стадия, связанная с внесением предложения
-
20
Подготовительная стадия
-
30
Стадия, связанная с подготовкой проекта комитета
-
40
Стадия, связанная с рассмотрением проекта международного стандарта
-
50
Стадия, на которой осуществляется принятие стандарта
-
60
Стадия, на которой осуществляется публикация
-
90
Стадия пересмотра
-
95
Стадия, на которой осуществляется отмена стандарта
-
00
Появились вопросы?
Ознакомьтесь с FAQ
Часы работы:
Понедельник – пятница: 09:00-12:00, 14:00-17:00 (UTC+1)
Будьте в курсе актуальных новостей ИСО
Подписывайтесь на наши новости, обзоры, а также на информацию о продуктах.