Фильтр :
| Стандарт и/или проект | Этап | ТК |
|---|---|---|
|
Process diagrams for power plants — Part 1: Specification for diagrams
|
90.93 | ISO/TC 10/SC 10 |
|
Process diagrams for power plants — Part 2: Graphical symbols
|
90.93 | ISO/TC 10/SC 10 |
|
Gas turbine combined cycle power plants — Thermal performance tests
|
90.92 | ISO/TC 192 |
|
ISO/DIS 18888 [В стадии разработки]
Gas turbine combined cycle power plants — Thermal performance tests
|
40.60 | ISO/TC 192 |
|
Guidance on water conservation techniques of circulating cooling water in thermal power plants
|
60.60 | ISO/TC 282/SC 4 |
|
Corrosion control engineering life cycle in fossil fuel power plants — General requirements
|
60.60 | ISO/TC 156/SC 1 |
|
Smart community infrastructure — Electric power infrastructure — Measurement methods for the quality of thermal power infrastructure and requirements for plant operations and management
|
90.93 | ISO/TC 268/SC 1 |
|
ISO 50045:2019 [Отозвано]
Technical guidelines for the evaluation of energy savings of thermal power plants
|
95.99 | ISO/TC 301 |
По запросу ничего не найдено. Пожалуйста, попробуйте изменить настройки фильтра.