Filtrar :
Norma o proyecto bajo la responsabilidad directa de ISO/TC 269/SC 1 Secretaría Etapa ICS
Railway infrastructure — Non-destructive testing on rails in track — Part 1: Requirements for ultrasonic testing and evaluation principles
60.60
Railway infrastructure — Rail mounted construction, maintenance and inspection machines — Explanation of machine type
60.60
Railway infrastructure — Track quality evaluation — Chord-based method
60.60
Plastics — Plastic railway sleepers for railway applications (railroad ties) — Part 1: Material characteristics
95.99
Railway applications — Polymeric composite sleepers, bearers and transoms — Part 1: Material characteristics
60.60
Railway applications — Polymeric composite sleepers, bearers and transoms — Part 2: Product testing
90.93
Railway applications — Polymeric composite sleepers, bearers and transoms — Part 3: General requirements
60.60
Railway applications — Track foundation — Observation and evaluation method of railway subgrade settlement and deformation
60.60
Railway infrastructure — Ballastless track — Part 1: General requirements
60.60
Railway infrastructure — Rail fastening systems — Two directional test method for resistance to repeated loading
60.60
Railway infrastructure — Rail fastening systems — Part 1: Vocabulary
90.93
Railway infrastructure — Rail fastening systems — Part 2: Test method for longitudinal rail restraint
90.60
Railway infrastructure — Rail fastening systems — Part 3: Proof load test method for pull-out resistance
90.60
Railway infrastructure — Rail fastening systems — Part 4: Test methods for resistance to repeated loading
90.93
Railway infrastructure — Rail fastening systems — Part 4: Test methods for resistance to repeated loading — Amendment 1
60.60
Railway infrastructure — Rail fastening systems — Part 5: Test method for electrical resistance
90.20
Railway infrastructure — Rail fastening systems — Part 6: Test method for resistance to severe environmental conditions
90.60
Railway infrastructure — Rail fastening systems — Part 7: Test method for clamping force and uplift stiffness
60.60
Railway infrastructure — Rail fastening systems — Part 8: Test method for vertical stiffness
60.60
Railway applications — Concrete sleepers and bearers for track — Part 1: General requirements
60.60
Railway applications — Concrete sleepers and bearers for track — Part 2: Prestressed monoblock sleepers
60.60
Railway applications — Track geometry quality — Part 1: Characterization of track geometry and track geometry quality
90.92
ISO/AWI 23054-1 [En desarrollo]
Railway applications — Track geometry quality — Part 1: Characterization of track geometry and track geometry quality
10.99
Railway infrastructure — Rail welding — Part 1: General requirements and test methods for rail welding
60.60
Railway infrastructure — Rail welding — Part 2: Aluminothermic welding
60.60
ISO/DIS 23300-3 [En desarrollo]
Railway infrastructure — Rail welding — Part 3: Gas pressure welding
40.00
ISO/DIS 23987-1 [En desarrollo]
Railway Infrastructure — Switches and crossings — Part 1: Vocabulary
40.99
ISO/WD 25385 [En desarrollo]
Railway infrastructure — Track works on ballasted tracks — Acceptance of trackworks on plain line, switches and crossings
20.60
ISO/WD 25651 [En desarrollo]
Railway infrastructure — Rail mounted construction, maintenance and inspection machines — Technical and safety requirements for trolleys and portable machines used for railway infrastructure construction, maintenance and inspection.
20.60
ISO/WD TR 26034 [En desarrollo]
Track maintenance management – Non-destructive testing of sleepers and fastenings systems
20.20

No se ha encontrado ningún registro que coincida. Pruebe a cambiar los ajustes de filtro.