TC 67
Materials, equipment and offshore structures for petroleum, petrochemical and natural gas industries
- Secretariat: NEN
- Secretary: Mr. Harold Pauwels
- Chairperson: (Switzerland)
- Creation date: 1947
- Work programme
(drafts and new work items of TC 67)
Scope:
Standardization of the materials, equipment and offshore structures used in the drilling, production, transport by pipelines and processing of liquid and gaseous hydrocarbons within the petroleum, petrochemical and natural gas industries.
Excluded:
- aspects of offshore structures subject to IMO requirements (ISO / TC 8).
| Total number of published ISO standards related to the TC and its SCs: | 157 |
| Number of published ISO standards under the direct responsibility of TC 67: | 14 |
| Participating countries: | 29 |
| Observing countries: | 31 |
ISO committees in liaison:
TC 5, TC 8, TC 14, TC 17, TC 31, TC 44, TC 96, TC 98, TC 108/SC 5, TC 115, TC 135, TC 153, TC 156, TC 164, TC 167, TC 176, TC 176/SC 2, TC 184/SC 4
IEC committees in liaison:
IEC/TC 18
Organizations in liaison:
Subcommittees/Working Groups:
| Subcommittee/Working Group | Title |
|---|---|
| TC 67/EC/MC |
Executive committee and Management committee The convener can be reached through the secretariat |
| TC 67/WG 2 |
Conformity assessment The convener can be reached through the secretariat |
| TC 67/WG 4 |
Data collection The convener can be reached through the secretariat |
| TC 67/WG 5 |
Aluminium alloy pipes The convener can be reached through the secretariat |
| TC 67/WG 7 |
Corrosion resistant materials The convener can be reached through the secretariat |
| TC 67/WG 8 |
Materials, corrosion control, welding and jointing, and non-destructive examination (NDE) The convener can be reached through the secretariat |
| TC 67/WG 10 | Liquefied Natural Gas (LNG) installations and equipment |
| TC 67/SC 2 | Pipeline transportation systems |
| TC 67/SC 3 | Drilling and completion fluids, and well cements |
| TC 67/SC 4 | Drilling and production equipment |
| TC 67/SC 5 | Casing, tubing and drill pipe |
| TC 67/SC 6 | Processing equipment and systems |
| TC 67/SC 7 | Offshore structures |
Joint working groups under the responsibility of another committee:
| TC 60/SC 2/WG 11 | Joint TC 60-TC 67/SC 6 WG : High speed enclosed helical gear units |
| TC 115/SC 3/WG 1 | Joint TC 115/SC 3-TC 67/SC 6 WG : Centrifugal pumps for petroleum and natural gas industries |
| TC 115/SC 3/WG 2 | Joint TC 115/SC 3-TC 67/SC 6 WG : Positive displacement pumps for petroleum and natural gas industries |
| TC 115/SC 3/WG 6 | Joint TC 115/SC 3-TC 67/SC 6 WG: Shaft sealing systems for centrifugal and rotary pumps |
| TC 118/SC 1/WG 1 | Joint TC 118/SC 1-TC 67/SC 6 WG : Turbo compressors/expanders for petroleum, chemical and gas industry services |
| TC 118/SC 1/WG 2 | Joint TC 118/SC 1-TC 67/SC 6 WG : Reciprocating compressors for petroleum, chemical and gas industry services |
| TC 118/SC 1/WG 3 | Joint TC 118/SC 1-TC 67/SC 6 WG : Rotary type positive displacement compressors for petroleum, chemical and gas industry services |
| TC 153/SC 1/WG 1 | Joint TC 153/SC 1-TC 67/SC 6 WG : Valves for the petroleum industry |
| TC 153/SC 1/WG 11 | Joint TC 153/SC 1-TC 67/SC 6 WG : Ball valves for the petroleum industry |
| TC 192/WG 4 | Joint TC 192-TC 67/SC 6 WG : Gas turbine |
Meeting calendar
* Information definite but meeting not yet formally convened
** Provisional
| Month | Location | |||
|---|---|---|---|---|
| March 2010 | 24-25 | London (United Kingdom) | ** | TC 67/SC 7 |
| April 2010 | 14-16 | (Netherlands) | ** | TC 67/SC 2 |
| May 2010 | 27-28 | Rome (Italy) | * | TC 67/SC 6 |
| June 2010 | 24-25 | Washington, D.C (USA) | ** | TC 67/SC 4 |
| June 2010 | Washington, D.C (USA) | ** | TC 67/SC 3 | |
| October 2010 | 26-27 | Doha (Qatar) | * | TC 67 |
| November 2010 | Rome (Italy) | ** | TC 67/SC 3 | |
| Month unknown 2010 | (Indonesia) | ** | TC 67/SC 5 | |
| June 2011 | San Francisco (USA) | ** | TC 67/SC 3 | |
| Month unknown 2011 | St. Petersburg (Russian Federation) | ** | TC 67/SC 5 |


