-
Secretariat:
UNI
Twinned secretariat: SAC
Secretary: Mr Giuliano Corbella
Twinned secretary: Mr. Changyi Qin
Chairperson: Mr. Denis Tikhomirov until end 2015
ISO Central Secretariat contact: Mrs. Kirsi Silander
-
ISO/TC 67/SC 2 - Secretariat
Italy (UNI)
Address
UNSIDER
Viale Sarca, 336
IT-I -20126 MILANO
Secretariat direct:
E-mail: corbella@unsider.it
Twinned secretariat
China (SAC)
Address
Standardization Administration of China
No. 9 Madian East Road
Haidian District
CN-Beijing 100088
Tel: +86 10 8226 2622
Fax: +86 10 8226 0660
E-mail: sac@sac.gov.cn
Web: http://www.sac.gov.cn
Secretariat direct:
Tel: +86 29 88726160
Fax: +86 29 88223416
E-mail: qincy@cnpc.com.cn
-
Subcommittees/Working Groups:
Subcommittee/Working Group Title ISO/TC 67/SC 2/EDC Editing committee
The convener can be reached through the secretariatISO/TC 67/SC 2/WG 2 Pipeline valves
The convener can be reached through the secretariatISO/TC 67/SC 2/WG 8 Pipeline welding
The convener can be reached through the secretariatISO/TC 67/SC 2/WG 9 Subsea pipeline valves
The convener can be reached through the secretariatISO/TC 67/SC 2/WG 10 Pipeline flanges, fittings and shopbends
The convener can be reached through the secretariatISO/TC 67/SC 2/WG 11 Pipeline cathodic protection
The convener can be reached through the secretariatISO/TC 67/SC 2/WG 12 Reliability-based limit state methods
The convener can be reached through the secretariatISO/TC 67/SC 2/WG 13 Maintenance of ISO 13623
The convener can be reached through the secretariatISO/TC 67/SC 2/WG 14 External pipeline protective coatings
The convener can be reached through the secretariatISO/TC 67/SC 2/WG 15 Testing procedures for mechanical connectors
The convener can be reached through the secretariatISO/TC 67/SC 2/WG 16 Line pipe
The convener can be reached through the secretariatISO/TC 67/SC 2/WG 17 Pipeline life extension
The convener can be reached through the secretariatISO/TC 67/SC 2/WG 18 Actuator sizing for pipeline valves
The convener can be reached through the secretariatISO/TC 67/SC 2/WG 19 Joint WG between SC 2 and SC 4: Wet thermal insulation coatings
The convener can be reached through the secretariatISO/TC 67/SC 2/WG 20 Steel cased pipelines
The convener can be reached through the secretariat -
Liaison Committee to ISO/TC 67/SC 2
The below committees may see the documents of ISO/TC 67/SC 2 :
ISO committees in liaison:
ISO/TC 5/SC 1, ISO/TC 138, ISO/TC 153
Liaison Committee from ISO/TC 67/SC 2
ISO/TC 67/SC 2 can access the documents of the below committees :
-
Meeting calendar
* Information definite but meeting not yet formally convened
** ProvisionalMonth Date Location TC/SC April 2014 8-10 (Brazil) ** TC 67/SC 2 -
IT Applications
Login required
